Event types sort your events by kind, e.g. team meeting, shift, rehearsal or practice. Each type has its own color and its own defaults. Everyone sees in the Scheduler at a glance what's coming up.

What do event types do?

  • A color per type You see right away what's next.
  • Defaults New events come prefilled.
  • Filters and stats Narrow events down by type.
  • Set once Applies to all your groups.
Animation: You pick the event type, Gumb fills in the rest, and the event shows up in the Scheduler in its color.

How do I create an event type?

  1. Click the gear ⚙️ next to your community name and open the Event Types tab (1).
  2. Click ➕ at the top right (2). A panel opens on the right.
  3. Enter an Event type name and pick a Color.
  4. Add defaults if you like, see below.
  5. Click Save changes.
Community settings: 1 Event Types tab, 2 Plus for a new type

What are defaults?

Presets Gumb copies into every new event of this type. You skip the typing, and all events of a type look the same. Under Set Preferences, fill in what never changes:

  • Name and color of the event type (1, 2)
  • Event name, location, times, description (3), e.g. Weekly meeting, 08:30 to 09:30
  • Set default response for all (4): This answer is already set for everyone invited, e.g. "I'll join". Anyone who can't make it changes it.

Then click Save changes (5). Defaults apply to new events. Existing events stay as they are.

Event type edit panel: 1 Event type name, 2 Color, 3 Event name, location, times and description, 4 Default response for all, 5 Save changes

How do I pick a color?

Click the eyedropper next to the color field (1). Pick one of the suggested colors (2) or set your own in the large field. Enter an exact color code under Hex. Give each type a color that clearly stands out from the others.

Color picker: 1 Color field and eyedropper, 2 Suggested colors

What happens when I create an event?

In Create event, pick the Event type (1). Gumb fills in event name, location, times and description (2) and sets the default response (3). You just pick the date and change what's different this time.

More: Scheduling 🗓️

Create event panel: 1 Event type Meeting, 2 Prefilled fields, 3 Default response I'll join

How do I edit an event type?

Set Event Defaults (1) and the pencil (2) open the same panel. Change the name, color and defaults there. The trash can (3) deletes the type. Gumb asks first.

Event type in the list: 1 Set Event Defaults, 2 Pencil, 3 Trash can

How do I cancel an event?

Instead of deleting it: Create a red event type "Cancelled" and switch the event to it. It stays in the Scheduler, and everyone sees right away that it's off.

More: Scheduling 🗓️

Which event types make sense?

As many as you really tell apart, usually four to eight. Typical ones are meeting, shift, rehearsal, practice, event and cancelled. An emoji in the name makes a type easier to spot.